Skip to content
September 14, 2026
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

𝓣𝓸𝓭𝓪𝔂 𝓢𝓽𝓪𝓽𝓮𝓶𝓮𝓷𝓽

The Statement Behind Every News

Primary Menu
  • Home
  • World
  • Politics
  • Business
  • Sports
  • Entertainment
  • Health
  • Technology
  • Media Story
Watch Videos
  • Home
  • Business
  • Mongolian gas flows surge as TMK Energy field comes alive
  • Business

Mongolian gas flows surge as TMK Energy field comes alive

Today Statement September 14, 2026 5 minutes read
Mongolian gas flows surge as TMK Energy field comes alive


Brought to you by BULLS N’ BEARS

Penny Taylor

September 14, 2026 — 4:56pm

You have reached your maximum number of saved items.

Remove items from your saved list to add more.

TMK Energy has chalked up another production milestone at its 100 per cent-owned Gurvantes XXXV coal seam gas (CSG) project in Mongolia, with flows showing an 11 per cent increase on August’s daily average and continuing to build across its production pilot.

Average gas production over the past week surged to more than 900 cubic metres per day, or 32,000 standard cubic feet per day (scfd). Gas rates have now climbed more than 350 per cent during the past 12 months.

TMK Energy’s LF-07 gas flare at its Gurvantes XXXV coal seam gas project in Mongolia, where rising gas flows are building the case for broader field development.

More significantly, three wells across TMK’s seven-well pilot, in addition to the company’s standout LF-07 well, are now pumping at record highs. The company says the improved performance points to growing gas desorption across the entire field, strengthening the case that the production uplift is spreading well beyond its best-performing well.

For CSG, the progression matters. Pumping water from the coal seams lowers reservoir pressure until methane detaches from the coal and begins flowing. TMK’s pilot has previously shown the combination reservoir engineers want to see – sustained water production, falling pressure and rising gas rates – while pressure communication between wells suggested they were interacting through the reservoir rather than behaving as isolated pockets.

‘We have the objective of being the largest CSG producer in Mongolia by the end of this calendar year, together with having the largest 2C contingent resource in Mongolia.’

TMK Energy chief executive officer Dougal Ferguson

That feeds directly into Gurvantes’ enduring technical question: repeatability. LF-07 became TMK’s benchmark after improved drilling, completion and pump settings delivered a stronger response. The commercial test is whether those lessons can be translated across enough wells to deliver predictable gas volumes over time.

The latest results move that test forward, with management saying the continuing month-on-month production rise strongly indicates the pilot will reach the minimum commercial flow rates required to support full-field development.

The company describes Gurvantes as the most successful operating CSG pilot well project in Mongolia, with the new production breakthrough pushing the project another step along its development path.

TMK Energy chief executive officer Dougal Ferguson said: “With yet another material, but sustained bump in gas production rates at the Pilot Well Project over the last week, our confidence in the commercial potential of the enormous Gurvantes XXXV Coal Seam Gas Project continues to grow.”

TMK’s growing confidence is about to face another test, as the company prepares to roll out a drilling and re-completion campaign as part of its broader 2026 work program. Earlier updates outlined one new production well using an optimised design based on lessons from LF-07, alongside re-completions of LF-02, LF-03 and LF-06. Two of those wells are among the three setting records.

Another key 2026 deliverable is the proposed 1-megawatt gas-to-power project with local partner Dashvaanjil Group, designed to turn pilot gas into electricity and provide an early commercial outlet. Management says the staged approach will allow TMK to prove up its customer and operating model using modest volumes before committing to a bigger field build-out.

The company’s top brass are in Mongolia this week, talking turkey with regulators to shift Gurvantes’ discovered 2C contingent resource into the reserves column and ultimately secure an exploitation licence. Earlier planning had flagged additional production data and a reserves assessment as part of that pathway.

Beyond the licence, full-field development would still require higher sustainable gas rates, development engineering and economics, infrastructure and financing. Gurvantes has a head start from its established South Gobi setting, although a larger operation would still require gas gathering, compression and treatment infrastructure, with pipelines potentially joining the shopping list depending on the final development model.

Together, the work program, gas-to-power project and reserves pathway are intended to tee up expanded appraisal drilling in 2027 and a wider field build-out.

The prize has scale. Gurvantes hosts an independently certified 1.2 trillion cubic feet of gas (Tcf) concentrated within just 60 square kilometres of TMK’s sprawling 8400sq km South Gobi tenure. Management says its 2C resource is the largest of its kind in Mongolia.

Potential demand also lies on its doorstep. The surrounding mining district already has roads, contractors and major industrial power users, while Mongolia’s constrained power system provides an identifiable domestic use for flexible gas-fired generation.

One strong well can prove a concept; multiple wells doing the same thing speaks volumes. TMK has added compelling evidence that Gurvantes could make the leap to a broader field, with drilling, reserves work and early commercialisation laying the foundations for development.

Is your ASX-listed company doing something interesting? Contact: mattbirney@bullsnbears.com.au

You have reached your maximum number of saved items.

Remove items from your saved list to add more.

From our partners

About the Author

Today Statement

Administrator

Visit Website View All Posts

Post navigation

Previous: Critica unveils 19Mt Tassie tin-tungsten heavyweight
Next: Kentwell Cup Grand Final 2026

Related Stories

Hundreds of jobs to go at Whyalla steelworks as blast furnace to stay shut
  • Business

Hundreds of jobs to go at Whyalla steelworks as blast furnace to stay shut

Today Statement September 14, 2026
US-Iran war: Fuel price blowout piles pressure on Albanese for second excise cut
  • Business

US-Iran war: Fuel price blowout piles pressure on Albanese for second excise cut

Today Statement September 14, 2026
Shipping giant to install 35-metre sail on cargo vessel to cut fuel bill
  • Business

Shipping giant to install 35-metre sail on cargo vessel to cut fuel bill

Today Statement September 14, 2026

Recent Posts

  • King Charles to discuss AI with company executives as threat fears mount – National
  • Longmire considering Kangaroos job
  • CJP backs Sibal’s anti-defection proposal, seeks 20-yr ban on defectors
  • Alleged assault on Dalit BJP leader: Demand grows for FIR against BJP MLA
  • ‘We’ve been fighting for 8 years’: Protest by teaching candidates in Lucknow nears fortnight

Recent Comments

No comments to show.

Archives

  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • November 2024

Categories

  • World
  • Business
  • Sports
  • Politics
  • Entertainment
  • Technology
  • Health
  • Science

Trending News

King Charles to discuss AI with company executives as threat fears mount – National King Charles to discuss AI with company executives as threat fears mount – National 1
  • World

King Charles to discuss AI with company executives as threat fears mount – National

September 14, 2026
Longmire considering Kangaroos job Longmire considering Kangaroos job 2
  • Sports

Longmire considering Kangaroos job

September 14, 2026
CJP backs Sibal’s anti-defection proposal, seeks 20-yr ban on defectors CJP backs Sibal’s anti-defection proposal, seeks 20-yr ban on defectors 3
  • Politics

CJP backs Sibal’s anti-defection proposal, seeks 20-yr ban on defectors

September 14, 2026
Alleged assault on Dalit BJP leader: Demand grows for FIR against BJP MLA Alleged assault on Dalit BJP leader: Demand grows for FIR against BJP MLA 4
  • Politics

Alleged assault on Dalit BJP leader: Demand grows for FIR against BJP MLA

September 14, 2026
‘We’ve been fighting for 8 years’: Protest by teaching candidates in Lucknow nears fortnight ‘We’ve been fighting for 8 years’: Protest by teaching candidates in Lucknow nears fortnight 5
  • Politics

‘We’ve been fighting for 8 years’: Protest by teaching candidates in Lucknow nears fortnight

September 14, 2026

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

Today Statement

Today Statement is a dynamic news website offering the latest updates on global and regional events, politics, business, entertainment, and technology. Known for its concise and accurate reporting, the platform caters to readers seeking quick yet comprehensive news insights, engaging features, and expert opinions on trending topics.

Categories

Business Entertainment Health Media Story Politics Sports Technology World

Recent Posts

  • King Charles to discuss AI with company executives as threat fears mount – National
  • Longmire considering Kangaroos job
  • CJP backs Sibal’s anti-defection proposal, seeks 20-yr ban on defectors
  • Alleged assault on Dalit BJP leader: Demand grows for FIR against BJP MLA
  • ‘We’ve been fighting for 8 years’: Protest by teaching candidates in Lucknow nears fortnight
Copyright © 2025 Today Statement | MoreNews by AF themes.